In September 2007 the railroad connection from downtown to the harbor was renewed on the island of
Borkum/ Germany. As part of this project three sections of the track were built with SOFTBETON to
lower the total weight of the dam, to allow for frequent flooding, and to accelerate the construction
process. For the first time ever a slab track construction with the sleepers embedded in foamed concrete
was realized.
|
|
Watch the construction video
Downloads
|
|
|
|